Wednesday, June 21, 2017

Management Process Industrial Engineering - Management Process Productivity Reengineering - Management Process Productivity Redesign



Industrial engineers  redesign processes to improve their productivity. Productivity improvement most of the times happens in that process only. But sometimes a change in the process can improve productivity in a downstream processes.

Industrial engineers evaluate management processes also for their productivity implications. Many times the management process may be negatively affecting productivity in the operations that are being carried out according to the plans and procedures prescribed by the management process. In such a case, industrial engineers may suggest a change in the process. The process change can be defined and developed by industrial engineers or managers themselves may do it. Industrial engineers from the time of F.W. Taylor (Father of Industrial Engineering) have suggested and implemented management process changes.

In the first full length work of Taylor, Shop Management, number of management changes were proposed and described with examples of implementation.

The management process or procedure changes suggested by F.W. Taylor are described below. This content is excerpted from Origin of Industrial Engineering - Shop Management

1. Definition of Management 


The art of management has been defined, "as knowing exactly what you want men to do, and then seeing that they do it in the best and cheapest way.'"

What the workmen want from their employers beyond anything else is high wages, and what employers want from their workmen most of all is a low labor cost of manufacture.

These two conditions are not diametrically opposed to one another as would appear at first glance. On the contrary, they can be made to go together in all classes of work, without exception

This book is written mainly with the object of advocating high wages and low labor cost as the foundation of the best management, of pointing out the general principles which render it possible to maintain these conditions even under the most trying circumstances, and of indicating the various steps which the writer thinks should be taken in changing from a poor system to a better type of management.



The possibility of coupling high wages with a low labor cost rests mainly upon the enormous difference between the amount of work which a first-class man can do under favorable circumstances and the work which is actually done by the average man.


6. Task Management



The writer has found, through an experience of thirty years, covering a large variety in manufactures, as well as in the building trades, structural and engineering work, that it is not only practicable but
comparatively easy to obtain, through a systematic and scientific time study, exact information as to how much of any given kind of work either a first-class or an average man can do in a day, and with this information as a foundation, he has over and over again seen the fact demonstrated that workmen of all classes are not only willing, but glad to give up all idea of soldiering, and devote all of their energies to turning out the maximum work possible, providing they are sure of a suitable permanent reward.

With accurate time knowledge as a basis, surprisingly large results can be obtained under any scheme of management from day work up; there is no question that even ordinary day work resting upon this foundation will give greater satisfaction than any of the systems in common use, standing as they do upon soldiering as a basis.


The writer chooses from among a large variety of trades to which these principles have been applied, the yard labor handling raw materials in the works of the Bethlehem Steel Company at South Bethlehem, Pa.,


The first step was to place an intelligent, college-educated man in charge of progress in this line. This man had not before handled this class of labor, although he understood managing workmen. He was not familiar with the methods pursued by the writer, but was soon taught the art of determining how much work a first-class man can do in a day. This was done by timing with a stop watch a first-class man while he was working fast. The best way to do this, in fact almost the only way in which the timing can be done with certainty, is to divide the man's work into its elements and time each element separately. For example, in the case of a man loading pig-iron on to a car, the elements should be: (a)
picking up the pig from the ground or pile (time in hundredths of a minute); (b) walking with it on a level (time per foot walked); (c) walking with it up an incline to car (time per foot walked); (d)
throwing the pig down (time in hundredths of a minute), or laying it on a pile (time in hundredths of a minute); (e) walking back empty to get a load (time per foot walked).

The most difficult elements to time and decide upon in this, as in most cases, are the percentage of the day required for rest, and the time to allow for accidental or unavoidable delays.


Example of 400% increase in work output


Between twelve and thirteen tons of pig-iron per man had been carried from a pile on the ground, up an inclined plank, and loaded on to a gondola car by the average pig-iron handler while working by the day.


A man was selected from persons doing this task  to make the first start under the writer's system. He was trained in a new way of working as developed by Taylor and his associates and supervised. He loaded on piece work from forty-five to forty-eight tons (2,240 lbs. each) per day.


He regarded this task as an entirely fair one, and earned on an average, from the start, $1.85 per day, which was 60 per cent more than he had been paid by the day.

As the first man started on the work earned steadily $1.85 per day, this object lesson gradually wore out the opposition to the new arrangement, which ceased rather suddenly after about two months. From this time on there was no difficulty in getting plenty of good men who were anxious to start on piece work under the new method in various jobs, and the difficulty lay in making with sufficient rapidity the accurate time study of the elementary operations or "unit times" which forms the foundation of this kind of piece work.

Throughout the introduction of piece work, which was done after a thorough time study, for each new section of the work, one man only was put on each new job, until he had demonstrated that the task set was a fair one by earning an average of $1.85 per day. After a few sections of the work had been
started in this way, the complaint on the part of the better workmen was that they were not allowed to go on to piece work fast enough. It required about two years to transfer practically all of the yard labor from day to piece work. And the larger part of the transfer was made during the last six months of this time.

The study of "unit times" for the yard labor took practically the time of two trained men for two years. Throughout this time the day and piece workers were under entirely separate and distinct management. The original foremen continued to manage the day work, and day and piece workers were never allowed to work together. Gradually the day work gang was diminished and the piece workers were increased as one section of work after another was transformed from the former to the latter.

Two elements which were important to the success of this work should be noted:

First, on the morning following each day's work, each workman was given a slip of paper informing him in detail just how much work he had done the day before, and the amount he had earned. This enabled him to measure his performance against his earnings while the details were fresh in his mind. Without this there would have been great dissatisfaction among those who failed to climb up to the task asked of them, and many would have gradually fallen off in their performance.

Second, whenever it was practicable, each man's work was measured separately by itself.

What the writer wishes particularly to emphasize is that this whole system rests upon an accurate and scientific study of unit times, which is by far the most important element in scientific management. With it, greater and more permanent results can be attained even under ordinary day work or piece work than can be reached under any of the more elaborate systems without it.


For each job there is the quickest time in which it can be done by a first-class man. This time may be called the "quickest time," or the "standard time" for the job. Under all the ordinary systems, this
"quickest time" is more or less completely shrouded in mist. In most cases, however, the workman is nearer to it and sees it more clearly than the employer.

Under ordinary piece work the management watch every indication given them by the workmen as to what the "quickest time" is for each job, and endeavor continually to force the men toward this "standard time," while the workmen constantly use every effort to prevent this from being done
and to lead the management in the wrong direction. In spite of this conflict, however, the "standard time" is gradually approached.

With accurate time study as a basis, the "quickest time" for each job is at all times in plain sight of both employers and workmen, and is reached with accuracy, precision, and speed, both sides pulling hard in the same direction under the uniform simple and just agreement that whenever a first-class man works his best he will receive from 30 to 100 per cent more than the average of his trade.






7. Investment for Increasing Productivity or Efficiency



Before starting to make any changes in the organization of a company the following matters should be carefully considered: First, the importance of choosing the general type of management best suited to the particular case. Second, that in all cases money must be spent, and in many cases a great deal of money, before the changes are completed which result in lowering cost. Third, that it takes time to reach any result worth aiming at. Fourth, the importance of making changes in their proper order, and that unless the right steps are taken, and taken in their proper sequence, there is great danger from deterioration in the quality of the output and from serious troubles with the workmen, often
resulting in strikes.

It is not at all generally realized that whatever system may be used, --providing a business is complex in its nature--the building up of an efficient organization is necessarily slow and sometimes very expensive.

Almost all of the directors of manufacturing companies appreciate the economy of a thoroughly modern, up-to-date, and efficient plant, and are willing to pay for it. Very few of them, however, realize that the best organization, whatever its cost may be, is in many cases even more important than the plant; nor do they clearly realize that no kind of an efficient organization can be built up without spending money. The spending of money for good machinery appeals to them because they can see machines after they are bought; but putting money into anything so invisible, intangible, and to the average man so indefinite, as an organization seems almost like throwing it away.



8. Importance of people - organization


The writer feels that management is also destined to become more of an art, and that many of the, elements which are now believed to be outside the field of exact knowledge will soon be standardized tabulated, accepted, and used, as are now many of the elements of engineering. Management will be studied as an art and will rest upon well recognized, clearly defined, and fixed principles instead of depending upon more or less hazy ideas received from a limited observation of the few organizations with which the individual may have come in contact. There will, of course, be various successful types, and the application of the underlying principles must be modified to suit each particular case. The writer has already indicated that he thinks the first object in management is to unite high wages with a low labor cost. He believes that this object can be most easily attained by the application of the
following principles:

(a) A LARGE (specified) DAILY TASK. --Each man in the establishment, high or low, should daily have a clearly defined task laid out before him. This task should not in the least degree be vague nor indefinite, but should be circumscribed carefully and completely, and should not be easy to accomplish (unless the operator works for the full allotted time with adequate speed).

(b) STANDARD CONDITIONS. --Each man's task should call for a full day's work, and at the same time the workman should be given such standardized conditions and appliances as will enable him to accomplish his task with certainty.

(c) HIGH PAY FOR SUCCESS (in completing the task). -- He should be sure of large pay when he accomplishes his task.

(d) LOSS IN CASE OF FAILURE (to complete the task). --When he fails he should be sure that sooner or later he will be the loser by it (because of low wages).

When an establishment has reached an advanced state of organization, in many cases a fifth element should be added, namely: the task should be made so difficult that it can only be accomplished by a first-class man.

They call, however, for a greater departure from the ordinary types of organization than would at first appear. In the case, for instance, of a machine shop doing miscellaneous work, in order to assign daily to each man a carefully measured task, a special planning department is required to lay out all of the work at least one day ahead. All orders must be given to the men in detail in writing; and in order to lay out the next day's work and plan the entire progress of work through the shop, daily returns must be made by the men to the planning department in writing, showing just what has been done. Before
each casting or forging arrives in the shop the exact route which it is to take from machine to machine should be laid out. An instruction card for each operation must be written out stating in detail just how each operation on every piece of work is to be done and the time required to do it, the drawing number, any special tools, jigs, or appliances required, etc. Before the four principles above referred to can be successfully applied it is also necessary in most shops to make important physical changes. All of the small details in the shop, which are usually regarded as of little importance and are left to be regulated according to the individual taste of the workman, or, at best, of the foreman, must be thoroughly and carefully standardized; such. details, for instance, as the care and tightening of the belts; the exact shape and quality of each cutting tool; the establishment of a complete tool room from which properly ground tools, as well as jigs, templates, drawings, etc., are issued under a good check system, etc.; and as a matter of importance (in fact, as the foundation of scientific management) an accurate study of unit times must be made by one or more men connected with the planning department, and each machine tool must be standardized and a table or slide rule constructed for it showing how to run it to the best advantage.

At first view the running of a planning department, together with the other innovations, would appear to involve a large amount of additional work and expense, and the most natural question would be is whether the increased efficiency of the shop more than offsets this outlay? It must be borne in mind, however, that, with the exception of the study of unit times, there is hardly a single item of work done in the planning department which is not already being done in the shop. Establishing a planning department merely concentrates the planning and much other brainwork in a few men especially fitted for their task and trained in their especial lines, instead of having it done, as heretofore, in most
cases by high priced mechanics, well fitted to work at their trades, but poorly trained for work more or less clerical in its nature.

15. Need for Functional Foremanship or Functional Organisation of Foremen


In the writer's experience, almost all shops are under-officered. The foreman has too many duties to fulfill.

His duties may be briefly enumerated in the following way. He must lay out the work for the whole shop, see that each piece of work goes in the proper order to the right machine, and that the man at the machine knows just what is to be done and how he is to do it. He must see that the work is not slighted, and that it is done fast, and all the while he must look ahead a month or so, either to provide more men to do the work or more work for the men to do. He must constantly discipline the men and readjust their wages, and in addition to this must fix piece work prices and supervise the timekeeping. Hence, Taylor advocates functional foremanship.

16. Functional Foremanship


The following is a brief description of the duties of the four types of executive functional bosses which the writer has found it profitable to use in the active work of the shop: (1) gang bosses, (2) speed bosses, (3) inspectors, and (4) repair bosses.

The gang boss has charge of the preparation of all work up to the time that the piece is set in the machine. It is his duty to see that every man under him has at all times at least one piece of work ahead at his machine, with all the jigs, templates, drawings, driving mechanism, sling chains, etc., ready to go into his machine as soon as the piece he is actually working on is done. The gang boss must show his men how to set their work in their machines in the quickest time, and see that they
do it. He is responsible for the work being accurately and quickly set, and should be not only able but willing to pitch in himself and show the men how to set the work in record time.

The speed boss must see that the proper cutting tools are used for each piece of work, that the work is properly driven, that the cuts are started in the right part of the piece, and that the best speeds and
feeds and depth of cut are used. His work begins only after the piece is in the lathe or planer, and ends when the actual machining ends. The speed boss must not only advise his men how best to do this work, but he must see that they do it in the quickest time, and that they use the speeds and feeds and depth of cut as directed on the instruction card In many cases he is called upon to demonstrate that the work can be done in the specified time by doing it himself in the presence of his men.

The inspector is responsible for the quality of the work, and both the workmen and speed bosses must see that the work is all finished to suit him. This man can, of course, do his work best if he is a master of the art of finishing work both well and quickly.

The repair boss sees that each workman keeps his machine clean, free from rust and scratches, and that he oils and treats it properly, and that all of the standards established for the care and maintenance of the machines and their accessories are rigidly maintained, such as care of belts and shifters, cleanliness of floor around machines, and orderly piling and disposition of work.

The following is an outline of the duties of the four functional bosses who are located in the planning room, and who in their various functions represent the department in its connection with the men. The first three of these send their directions to and receive their returns from the men, mainly in writing. These four representatives of the planning department are, the (1) order of work and route clerk, (2) instruction card clerk, (3) time and cost clerk, and (4) shop disciplinarian.

Order of Work and Route Clerk. After the route clerk in the planning department has laid out the exact route which each piece of work is to travel through the shop from machine to machine in order that it may be finished at the time it is needed for assembling, and the work done in the most economical way, the order of work clerk daily writes lists instructing the workmen and also all of the executive shop bosses as to the exact order in which the work is to be done by each class of machines or men, and these lists constitute the chief means for directing the workmen in this particular function.

Instruction Card Clerks. The "instruction card," as its name indicates, is the chief means employed by the planning department for instructing both the executive bosses and the men in all of the details of their work. It tells them briefly the general and detail drawing to refer to, the piece number and the cost order number to charge the work to, the special jigs, fixtures, or tools to use, where to start each cut, the exact depth of each cut, and how many cuts to take, the speed and feed to be used for each cut, and the time within which each operation must be finished. It also informs them as to the piece rate, the differential rate, or the premium to be paid for completing the task within the specified time (according to the system employed); and further, when necessary, refers them by name to the man who will give them especial directions. This instruction card is filled in by one or more members of the planning department, according to the nature and complication of the instructions, and bears the same relation to the planning room that the drawing does to the drafting room. The man who sends it into the shop and who, in case difficulties are met with in carrying out the instructions, sees that the proper man sweeps these difficulties away, is called the instruction card foreman.

Time and Cost Clerk. This man sends to the men through the "time ticket" all the information they need for recording their time and the cost of the work, and secures proper returns from them. He refers these for entry to the cost and time record clerks in the planning room.

Shop Disciplinarian. In case of insubordination or impudence, repeated failure to do their duty, lateness or unexcused absence, the shop disciplinarian takes the workman or bosses in hand and applies the proper remedy. He sees that a complete record of each man's virtues and defects is kept. This man should also have much to do with readjusting the wages of the workmen. At the very least, he should invariably be consulted before any change is made. One of his important functions should be that of peace-maker.

17. Production Planning and Control


The following are the leading functions of the planning department:

(a) The complete analysis of all orders for machines or work taken by the company.

(b) Time study for all work done by hand throughout the works, including that done in setting the work in machines, and all bench, vise work and transportation, etc.

(c) Time study for all operations done by the various machines.

(d) The balance of all materials, raw materials, stores and finished parts, and the balance of the work ahead for each class of machines and workmen.

(e) The analysis of all inquiries for new work received in the sales department and promises for time of delivery.

(f) The cost of all items manufactured with complete expense analysis and complete monthly comparative cost and expense exhibits.

(g) The pay department.

(h) The mnemonic symbol system for identification of parts and for charges.

(i) Information bureau.

(j) Standards.

(k) Maintenance of system and plant, and use of the tickler.

(l) Messenger system and post office delivery.

(m) Employment bureau.

(n) Shop disciplinarian.

(o) A mutual accident insurance association.

(p) Rush order department.

(q) Improvement of system or plant.


18. Role of Top Management in Managing Change to High Productive Shop

Before starting to make any radical changes leading toward an improvement in the system of management, it is desirable, and for ultimate success in most cases necessary, that the directors and the important owners of an enterprise shall be made to understand, at least in a general way, what is involved in the change. They should be informed of the leading objects which the new system aims at, such, for instance, as rendering mutual the interests of employer and employee through "high wages and low labor cost," the gradual selection and development of a body of first class picked workmen who will work extra hard and receive extra high wages and be dealt with individually instead of in masses.

They should thoroughly understand that this can only be accomplished through the adoption of precise and exact methods, and having each smallest detail, both as to methods and appliances, carefully selected so as to be the best of its kind. They should understand the general philosophy of the system and should see that, as a whole, the system to be introduced must be in harmony with its few leading ideas,

They should be shown that it pays to employ an especial corps to introduce a new system just as it pays to employ especial designers and workmen to build a new plant; that, while a new system is being introduced, almost twice the number of foremen are required as are needed to run it after it is in; that all of this costs money, but that, unlike a new plant, returns begin to come in almost from the start from improved methods and appliances as they are introduced, and that in most cases the new system more than pays for itself as it goes along; that time, and a great deal of time, is involved in a radical change in management, and that in the case of a large works if they are incapable of looking ahead and patiently waiting for from two to four years, they had better leave things just as they are, since a change of system involves a change in the ideas, point of view and habits of many men with strong convictions and prejudices, and that this can only be brought about slowly and chiefly through a series of object lessons, each of which takes time, and through continued reasoning; and that for this reason, after deciding to adopt a given type, the necessary steps should be taken as fast as possible, one after another, for its introduction. The directors should be convinced that an increase m the proportion of non-producers to producers means increased economy and not red tape, providing the non-producers are kept busy at their respective functions.

They should be prepared to lose some of their valuable men who cannot stand the change and also for the continued indignant protest of many of their old and trusted employees who can see nothing but extravagance in the new ways and ruin ahead.

19. Train Operators in High Productivity One by One and Then in Small Batches

Organizing for Introducing New Methods and Functional Foremenship


Before taking any steps toward changing methods the manager should realize that at no time during the introduction of the system should any broad, sweeping changes be made which seriously affect a large number of the workmen.  Throughout the early stages of organization each change made should affect one workman only, and after the single man affected has become used to the new order of things, then change one man after another from the old system to the new, slowly at first, and rapidly as  public opinion in the shop swings around under the influence of proper object lessons. Throughout a considerable part of the time, then, there will be two distinct systems of management in operation in the same shop; and in many cases it is desirable to have the men working under the new system managed by an entirely different set of foremen, etc., from those under the old.

The first step, after deciding upon the type of organization, should be the selection of a competent man to take charge of the introduction of the new system. The manager should keep himself free as far as possible from all active part in the introduction of the new system. While changes are going on it will require his entire energies to see that there is no falling off in the efficiency of the old system and that the quality and quantity of the output is kept up.

The respective duties of the manager and the man in charge of improvement, and the limits of the authority of the latter should be clearly defined and agreed upon, always bearing in mind that responsibility should invariably be accompanied by its corresponding measure of authority.

The worst mistake that can be made is to refer to any part of the system as being "on trial." Once a given step is decided upon to implement based on various trials, all parties must be made to understand, that now they have to implement.In making changes in system the things that are given a
"fair trial" fail, while the things that "must go," go all right.

Where to begin is a perplexing and bewildering problem. Employees are in general suspicious of change.

The first changes should be such as to allay the suspicions of the men and convince them by actual contact that the reforms are after all rather harmless and are only such as will ultimately be of benefit
to all concerned. Such improvements then as directly affect the workmen least should be started first. At the same time it must be remembered that the whole operation is of necessity so slow that the new system should be started at as many points as possible, and constantly pushed as hard as possible. In the metal working plant which we are using for purposes of illustration a start can be made at once along all of the following lines:

First. The introduction of standards (standard conditions) throughout the works and office.

Second. The scientific study of unit times on several different kinds of work.

Third. A complete analysis of the pulling, feeding power and the proper speeding of the various machine tools throughout the place with a view of making a slide rule for properly running each machine.

Fourth. The work of establishing the system of time cards by means of which ultimately all of the desired information will be conveyed from the men to the planning room.

Fifth. Overhauling the stores issuing and receiving system so as to establish a complete running balance of materials.

Sixth. Ruling and printing the various blanks that will be required for shop returns and reports, time cards, instruction cards, expense sheets, cost sheets, pay sheet, and balance records; storeroom; tickler; and maintenance of standards, system, and plant, etc.; and starting such functions of the planning room as do not directly affect the men.

If the works is a large one, the man in charge of introducing the system should appoint a special assistant in charge of each of the above functions just as an engineer designing a new plant would start a number of draftsmen to work upon the various elements of construction.

Training Functional Foremen 


The most important and difficult task of the organizer will be that of selecting and training the various functional foremen who are to lead and instruct the workmen, and his success will be measured principally by his ability to mold and reach these men. They cannot be found, they must be made. They must be instructed in their new functions largely, in the beginning at least, by the organizer himself; and this instruction, to be effective, should be mainly in actually doing the work. Explanation and theory Will go a little way, but actual doing is needed to carry conviction. To illustrate: For nearly two and one-half years in the large shop of the Bethlehem Steel Company, one speed boss after another was instructed in the art of cutting metals fast on a large motor-driven lathe which was especially fitted to run at any desired speed within a very wide range. The work done in this machine was entirely connected, either with the study of cutting tools or the instruction of speed bosses. It was most interesting to see these men, principally either former gang bosses or the best workmen, gradually change from their attitude of determined and positive opposition to that in most cases of enthusiasm for, and earnest support of, the new methods. It was actually running the lathe themselves according to the new method and under the most positive and definite orders that produced the effect. The writer himself ran the lathe and instructed the first few bosses. It required from three weeks to two months for each man.

Perhaps the most important part of the gang boss's and foreman's education lies in teaching them to promptly obey orders and instructions received not only from the superintendent or some official high in the company, but from any member of the planning room whose especial function it is to direct the rest of the works in his particular line; and it may be accepted as an unquestioned fact that no gang boss is fit to direct his men until after he has learned to promptly obey instructions received from any proper source, whether he likes his instructions and the instructor or not, and even although he may be convinced that he knows a much better way of doing the work. The first step is for each man to learn to obey the laws as they exist, and next, if the laws are wrong, to have them reformed in the proper way.

20. Organizing a Small Workshop for High Productivity


In starting to organize even a comparatively small shop, containing say from 75 to 100 men, it is best to begin by training in the full number of functional foremen, one for each function, since it must be
remembered that about two out of three of those who are taught this work either leave of their own accord or prove unsatisfactory; and in addition, while both the workmen and bosses are adjusting themselves to their new duties, there are needed fully twice the number of bosses as are required to carry on the work after it is fully systematized.


21. Introducing Functional Foremanship


The first of the functional foremen to be brought into actual contact with the men should be the inspector; and the whole system of inspection, with its proper safeguards, should be in smooth and
successful operation before any steps are taken toward stimulating the men to a larger output; otherwise an increase in quantity will probably be accompanied by a falling off in quality.


Next choose for the application of the two principal functional foremen, viz., the speed boss and the gang boss.


It is of the utmost importance that the first combined application of time study, slide rules, instruction cards, functional foremanship, and a premium for a large daily task should prove a success both for the workmen and for the company, and for this reason a simple class of work should be chosen for a start. The entire efforts of the new management should be centered on one point, and continue there until unqualified success has been attained.

When once this gain has been made, a peg should be put in which shall keep it from sliding back in the least; and it is here that the task idea with a time limit for each job will be found most useful.


22. Personal Relations Between Employers and Employed


"No system of management, however good, should be applied in a wooden way. The proper personal relations should always be maintained between the employers and men; and even the prejudices of the workmen should be considered in dealing with them.

"The opportunity which each man should have of airing his mind freely, and having it out with his employers, is a safety-valve; and if the superintendents are reasonable men, and listen to and treat with respect what their men have to say, there is absolutely no reason for labor unions and strikes.


"It is not the large charities (however generous they may be) that are needed or appreciated by workmen so much as small acts of personal kindness and sympathy, which establish a bond of friendly feeling between them and their employers.

"The moral effect of this system on the men is marked. The feeling that substantial justice is being done them renders them on the whole much more manly, straightforward, and truthful. They work more cheerfully, and are more obliging to one another and their employers.

23. Don't be in a hurry - It Takes Time to Manage Change


Time is an important factor in managing the change from current productivity to high productivity. If any one expects large results in six months or a year in a very large works he is looking for the impossible. If any one expects to convert union men to a higher rate of production, coupled with high wages, in six months or a year, he is expecting next to an impossibility. But if he is patient enough to wait for two or three years, he can go among almost any set of workmen in the country and get results.

Other prominent pioneer industrial engineers like Frank Gilbreth, Harrington Emerson, Henry Gantt, H.B. Maynard, R.L. Barnes, Benjamin Niebel, Marvin Mundel, Shigeo Shingo and others did management process industrial engineering redesigned management processes for improving the productivity systems being managed or for reducing the resources involved in running the management process.

The research journals of industrial engineering still carry many articles in which industrial engineering professors and professionals keep making various suggestions to modify management processes for improving the productivity of systems.


Management Systems Engineering - Book

http://www.wmich.edu/emrl/vt/pdf/book/4015/

http://www.wmich.edu/emrl/vt/pdf/book/


Updated  23 June 2017, 18 March 2017